WELCOME TO OUR BLOG

We're sharing knowledge in the areas which fascinate us the most
click
October 20th, 2026

Efficiency Gains in Concept-stage design for Global Projects

Integrating DfMA detailing, bolted modular design, structural analysis, and 3D modeling streamlines global steel structure projects by enhancing compliance, cutting costs, and accelerating timelines.
October 9th, 2026

GB to AISC or Eurocode Conversion Checklist for Steel Buildings: Loads, Materials, Connections, and Documentation

A four-layer conversion basis, twelve verification steps, and a three-level risk matrix help teams move GB steel designs into AISC or Eurocode delivery without losing design intent.
October 8th, 2026

How to Review a DfMA-Based Steel Structure Package Before Fabrication: A Buyer and Engineering Review Checklist

A six-gate review, eight evidence checks, and a low-medium-high risk matrix help release a coordinated steel package to fabrication.